WBFS Window Board Fixing Strap​s

WBFS  is a thin profile engineered window board strap used to attach timber window boards to the internal face of a masonry wall and many other non structural general fixing applications.

Code Size Units
WBFS W 30 x L 200 x L2 100mm 100 Pack

Features:

  • Thin profile
  • Easy to use
  • Fixings: By building designer
  • Packaging:100 straps per box
Successfully added {{filename}} to your quote list